
CLIENT | ADILMER S.A. - OSE (State Sewage & Water Works) |
PROJECT | Elevated Potable Water Tanks -10 to 15mt high- throughout the South Coastal Region (Colonia, San José, Flores and Soriano ) |
DATE | 2013 |
TYPE OF CONTRACT | Construction |
DESCRIPTION | Dismantling and removal of elevated potable water tanks -10 to 15 mt high- throughout the South Coastal Region |
WORK VOLUME | |
Dismantling of Concrete Water Tanks | 23 units |
Dismantling of Metalic Structures | 70 ton |