CLIENT | Conaprole |
PROJECT | Refunctionalization and refurbishment of anerobic reactor N°4 - Industrial Complex (CIVR) – PLANT #8 / Villa Rodriguez, San Jose. |
DATE | 2023 - 2024 |
TYPE OF CONTRACT | Executive Project and Construction |
DESCRIPTION | Inlet and outlet piping, internal distribution piping, recirculation, biogas collection. Valve systems, installation of new HDPE membrane, repairs to existing membrane. Construction of a new measuring chamber and a new stainless steel loading/distribution tower. |
WORK VOLUME | |
Sludge extraction | 1700m3 |
Soil movement | 100m3 |
PEAD pipes and valves | 500m |
Metallic structures and stainless steel | 2 Ton |
PEAD membrane | 2700m2 |