logo
  • Home
  • Company
  • Our Team
  • Projects – Works
  • Clients
  • Contact
  • Español
  • English

Conaprole
Refunctionalization and refurbishment of anerobic reactor N°4 - Industrial Complex (CIVR) – PLANT #8 / Villa Rodriguez, San Jose.

CLIENTConaprole
PROJECTRefunctionalization and refurbishment of anerobic reactor N°4 - Industrial Complex (CIVR) – PLANT #8 / Villa Rodriguez, San Jose.
DATE2023 - 2024
TYPE OF CONTRACTExecutive Project and Construction
DESCRIPTION

Inlet and outlet piping, internal distribution piping, recirculation, biogas collection. Valve systems, installation of new HDPE membrane, repairs to existing membrane. Construction of a new measuring chamber and a new stainless steel loading/distribution tower.

WORK VOLUME

Sludge extraction

1700m3

Soil movement

100m3

PEAD pipes and valves

500m

Metallic structures and stainless steel

2 Ton

PEAD membrane

2700m2

BACK TO PROJECTS LISTVIEW PROJECTS MAP

Copyright © 2021 IS Consultores. All rights reserved.

Tel: (+598) 2505 2796 | info@isconsultores.com.uy